We recently unearthed an article from 1924 that described the ingenious conveyor system that was rigged up during construction of Wanaque Reservoir. “A little more than a third of the 379,000 cubic yards of impervious fill [that is] needed at the main dam is top soil being taken from the Decker farm*, across turnpike, railroad and river, by that half-mile of belt conveyor, which is the only one of its kind and size ever used in this state. It is an interesting operation, so interesting that residents can be seen sitting on the fence along the Greenwood Lake turnpike watching that stream of dirt flow by.


The article continues, “The belt conveyor system eliminates three difficulties which the use of a narrow gage railway would have presented. Where the railway would have had to cross both the tracks of the Greenwood Lake branch of the Erie Railroad and the state highway, with the necessity for watchmen and the possibility of long delays or accidents, the belt conveyor goes under the river trestle of the railroad and through an unused culvert under the highway.
The above photos are from the Sam DeBenedetto collection which is now housed at Wanaque Public Library.
* No, we don’t know what property they were calling the Old Decker Farm! If it was old in 1924, it may have been forgotten. We do know that the farm is where workers were fed and housed, and that it was between 2,500 and 3,500 feet east of what would become Raymond Dam. If you have any info about this, please contact us!
This article originally appeared in the July 9, 1924 edition of the Passaic Daily News. View the original (unformatted) article here: part 1 and part 2